680 documents. Built for the maximum-risk EPC/Turnkey world, dual 1999 & 2017 — hold the line on a non-neutral Employer’s Representative, fitness-for-purpose obligations and turnkey risk transfer, with precision and authority. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.
Holds the line on turnkey risk transfer, protecting margin and entitlements exactly where the Silver Book pushes hardest against the contractor.
680 documents. Built for the maximum-risk EPC/Turnkey world, dual 1999 & 2017 — hold the line on a non-neutral Employer’s Representative, fitness-for-purpose obligations and turnkey risk transfer, with precision and authority. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.
| Structured FIDIC intelligence | Strategic notices and templates for both roles |
|---|---|
| Pure Silver Book voice | Correct EPC/Turnkey terminology and the non-neutral Employer’s Representative, both editions. |
| Fitness-for-purpose | Notices that address the fitness-for-purpose obligation head-on. |
| Turnkey risk transfer | Built to hold the line where the Silver Book shifts risk to the contractor. |
| Contract Administration | 680 notices; Contractor and Employer (single point of responsibility); dual 1999 & 2017. |
|---|---|
| Set-up & governance | Mobilisation and governance notices. |
| Design & ER (turnkey) | Design and ER-error notices under turnkey responsibility. |
| Instructions & scope | Engineer’s instructions and scope-change notices. |
| Time, programme & delay (EOT) | Programme, delay, EOT and advance-warning notices. |
| Tests, taking-over & payment | Tests on Completion, taking-over, applications and payment. |
| Termination & disputes | Default, termination and disputes. |
| Financial administration | Completed financial-administration documents — payment applications, statements, valuations, retention, set-off and the final statement. |
| Claims & variations (VOs) | Variations and Variation Orders (VOs), plus the full claims spine (SC 20.1) with the layered reservation-of-rights tripod. |
| Advanced mechanics | Contract-ending, dispute, force-majeure and governance / compliance / sustainability / security cascades. |
Based on the HICE methodology and its 6-layer architecture: every notice follows the same engineered structure — metadata and recipient blocks, a lettered (A) –(F) substantive body, a signature block and the embedded reservation-of-rights tripod — and is tested against the HICE five-dimension analysis (Contract, Reality, Money, Risk, Behaviour). Condition-precedent and time-bar discipline are built in throughout, so entitlement is preserved by design.
The HICE Editions are built for teams who bring their own strategy. If you need the notice regime set up, managed, or integrated from day one, HICE delivers this directly through Contractual Notice Architecture & Set-Up. If a claim is already in motion, see Claims & Dispute Resolution. If your team needs training to run the system operationally, explore Contracts-Management Training.