751 documents. Master the Plant & Design-Build assignments, dual 1999 & 2017 — design responsibility, Tests on Completion, EOT and the full claims spine, drafted to survive scrutiny by the Engineer, the DAAB and the tribunal. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.
Design and Tests-on-Completion exposure controlled, EOT and claims positioned early — so time and money stay on your side.
751 documents. Master the Plant & Design-Build assignments, dual 1999 & 2017 — design responsibility, Tests on Completion, EOT and the full claims spine, drafted to survive scrutiny by the Engineer, the DAAB and the tribunal. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.
| Structured FIDIC intelligence | Strategic notices and templates for all roles |
|---|---|
| Pure Yellow Book voice | Correct Plant & Design-Build terminology and the contractor-design model, both editions. |
| Design responsibility | Notices built around the contractor’s design obligation and the Employer’s Requirements. |
| Tests on Completion | The Tests-on-Completion and performance-test sequence handled correctly. |
| Contract Administration | 751 notices; all roles (Contractor, Employer and Engineer); dual 1999 & 2017. |
|---|---|
| Set-up & governance | Mobilisation, governance and early-works notices. |
| Design & Employer’s Requirements | Design-development, ER-error and design-approval notices. |
| Instructions & scope | Engineer’s instructions and scope-change notices. |
| Time, programme & delay (EOT) | Programme, delay, EOT and advance-warning notices. |
| Tests, taking-over & payment | Tests on Completion, taking-over, applications and IPCs. |
| Termination & disputes | Default, termination and disputes. |
| Financial administration | Completed financial-administration documents — payment applications, Interim Payment Certificates, valuations, statements, retention, set-off and the Final Payment Certificate. |
| Claims & variations (VOs) | Variations and Variation Orders (VOs), plus the full claims spine (SC 20.1) with the layered reservation-of-rights tripod. |
| Advanced mechanics | Contract-ending, dispute, force-majeure and governance / compliance / sustainability / security cascades. |
Based on the HICE methodology and its 6-layer architecture: every notice follows the same engineered structure — metadata and recipient blocks, a lettered (A) –(F) substantive body, a signature block and the embedded reservation-of-rights tripod — and is tested against the HICE five-dimension analysis (Contract, Reality, Money, Risk, Behaviour). Condition-precedent and time-bar discipline are built in throughout, so entitlement is preserved by design.
The HICE Editions are built for teams who bring their own strategy. If you need the notice regime set up, managed, or integrated from day one, HICE delivers this directly through Contractual Notice Architecture & Set-Up. If a claim is already in motion, see Claims & Dispute Resolution. If your team needs training to run the system operationally, explore Contracts-Management Training.