480 documents. Lean contract, sharp notices — giant-project rigour for small and medium works: prejudice-rule awareness, the sole-Adjudicator route and Cost Plus Profit mechanics, in fast, issue-ready form. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.
Big-project discipline at small-project cost — entitlements protected, risk priced early, and disputes pre-empted before they erode profit.
480 documents. Lean contract, sharp notices — giant-project rigour for small and medium works: prejudice-rule awareness, the sole-Adjudicator route and Cost Plus Profit mechanics, in fast, issue-ready form. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.
| Structured FIDIC intelligence | Strategic notices and templates for all roles |
|---|---|
| Pure Green Book voice | Three-party Short Form language (Employer, Engineer, Contractor), the sole-Adjudicator route (SC 10.2) and “Exceptional Event”. |
| Prejudice-rule aware | Notices framed around the Green Book’s prejudice rule rather than a rigid bar. |
| Cost Plus Profit mechanics | Valuation and payment notices built for the Short Form’s cost-plus machinery. |
| Contract Administration | 480 notices; three-party (Employer, Engineer and Contractor). |
|---|---|
| Commencement & Programme | Start-up, Programme and progress notices. |
| Performance management | Instructions and performance-management notices. |
| Payment & cashflow | Applications, valuations and Cost Plus Profit payment notices. |
| Financial administration | Completed financial-administration documents — Cost Plus Profit applications, valuations, certificates, statements, retention and the final account. |
| Claims & variations (VOs) | Variations and Variation Orders (VOs) and Cost-claim notices, framed around the Green Book’s prejudice rule. |
| Suspension, termination & disputes | Suspension, termination and the sole-Adjudicator route. |
| Exceptional events & closure | Exceptional Event, risk, compliance and close-out. |
Based on the HICE methodology and its 6-layer architecture: every notice follows the same engineered structure — metadata and recipient blocks, a lettered (A) –(F) substantive body, a signature block and the embedded reservation-of-rights tripod — and is tested against the HICE five-dimension analysis (Contract, Reality, Money, Risk, Behaviour). Condition-precedent and time-bar discipline are built in throughout, so entitlement is preserved by design.
The HICE Editions are built for teams who bring their own strategy. If you need the notice regime set up, managed, or integrated from day one, HICE delivers this directly through Contractual Notice Architecture & Set-Up. If a claim is already in motion, see Claims & Dispute Resolution. If your team needs training to run the system operationally, explore Contracts-Management Training.