Unlimited users; unrestricted use of the notices on that one contract. No resale, redistribution, or rebranding. Solely for intended use within specific contract environment.
Unlimited users; unrestricted use across the organisation. No reselling, redistributing, or rebranding the notices as the buyer's own.
With strategic guidance (guided package): a layer the market has never offered — each notice carries built-in HICE strategy: purpose, timing, condition-precedent deadlines, every party’s interests and the tension points to hold, end to end.
Without (Notices Only): the same strategic issue-ready notices, clean and unannotated, for those who bring their own strategy.
Includes the AI-Integration product copy, features and deployment contents below.

HICE Execution Architecture – contractual notices for FIDIC Yellow Book 1999 & 2017 ed.

751 documents. Master the Plant & Design-Build assignments, dual 1999 & 2017 — design responsibility, Tests on Completion, EOT and the full claims spine, drafted to survive scrutiny by the Engineer, the DAAB and the tribunal. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.

Price
€700.00 – €2,200.00 (excl. VAT)
€900.00 – €3,900.00
Launch price
Guidance
Licence

Added value

Design and Tests-on-Completion exposure controlled, EOT and claims positioned early — so time and money stay on your side.

751 documents. Master the Plant & Design-Build assignments, dual 1999 & 2017 — design responsibility, Tests on Completion, EOT and the full claims spine, drafted to survive scrutiny by the Engineer, the DAAB and the tribunal. Notices, templates and expert set-up for FIDIC contracts administration in line with HICE methodology — institutional-class, built on the HICE 6-layer architecture.

Features

Structured FIDIC intelligence Strategic notices and templates for all roles
Pure Yellow Book voice Correct Plant & Design-Build terminology and the contractor-design model, both editions.
Design responsibility Notices built around the contractor’s design obligation and the Employer’s Requirements.
Tests on Completion The Tests-on-Completion and performance-test sequence handled correctly.

What’s included

Contract Administration 751 notices; all roles (Contractor, Employer and Engineer); dual 1999 & 2017.
Set-up & governance Mobilisation, governance and early-works notices.
Design & Employer’s Requirements Design-development, ER-error and design-approval notices.
Instructions & scope Engineer’s instructions and scope-change notices.
Time, programme & delay (EOT) Programme, delay, EOT and advance-warning notices.
Tests, taking-over & payment Tests on Completion, taking-over, applications and IPCs.
Termination & disputes Default, termination and disputes.
Financial administration Completed financial-administration documents — payment applications, Interim Payment Certificates, valuations, statements, retention, set-off and the Final Payment Certificate.
Claims & variations (VOs) Variations and Variation Orders (VOs), plus the full claims spine (SC 20.1) with the layered reservation-of-rights tripod.
Advanced mechanics Contract-ending, dispute, force-majeure and governance / compliance / sustainability / security cascades.

Methodology

Based on the HICE methodology and its 6-layer architecture: every notice follows the same engineered structure — metadata and recipient blocks, a lettered (A) –(F) substantive body, a signature block and the embedded reservation-of-rights tripod — and is tested against the HICE five-dimension analysis (Contract, Reality, Money, Risk, Behaviour). Condition-precedent and time-bar discipline are built in throughout, so entitlement is preserved by design.

What you are buying is leverage: notices drafted to senior-counsel standard, with the strategy normally billed at day-rates built in. A single entitlement preserved, one variation priced correctly, or one dispute avoided will typically exceed the price of the whole library.
Strategic guidance With strategic guidance (guided package): a layer the market has never offered — each notice carries built-in HICE strategy: purpose, timing, condition-precedent deadlines, every party's interests and the tension points to hold, end to end. Without (Notices Only): the same strategic issue-ready notices, clean and unannotated, for those who bring their own strategy.
Delivery & refund information
Format Editable and unrestricted DOCX format. Every document is delivered as a native Word file.
Delivery Your documents are available the moment payment is confirmed - no waiting, no manual processing.
Refund policy Given the unprecedented nature of this work and that it is delivered as unprotected, editable Word documents with examples published online, all sales are final; kindly refer to our Refunds Policy.
Explore all HICE Editions
Need expert support alongside these documents?

The HICE Editions are built for teams who bring their own strategy. If you need the notice regime set up, managed, or integrated from day one, HICE delivers this directly through Contractual Notice Architecture & Set-Up. If a claim is already in motion, see Claims & Dispute Resolution. If your team needs training to run the system operationally, explore Contracts-Management Training.